SAFEWAY CONTRACTORS
Roofing | Masonry | Paving
Paving

Road Surfacing across Ontario

Private roads, subdivision infrastructure, industrial access and rural road builds, full-width hot-mix with matching engineering.

Overview

Why this service matters, and how we approach it.

Road-grade paving isn't residential driveway paving scaled up. It's a different engineering problem: heavier loads, steeper drainage requirements, proper crown for water shedding, and asphalt mixes specified to HL1 or HL3 standard rather than residential HL4.

Our road crews run larger plant: heavy pavers, tandem vibratory rollers, milling machines and full survey kits. We work to MTO specification where required and provide full compaction testing and drainage as-builts for private subdivisions.

Get a free estimate

Tell us about your project, we'll respond within one business day.

No deposit required
Pay on completion
Same-day call-outs
Free, no-obligation quotes
What's included

How we approach every road surfacing project.

MTO-spec mixes

HL1, HL3 and HL8 surface/binder courses to Ontario transportation standards.

Proper crown & drainage

Road crowns engineered to shed water, ditches and culverts sized to event.

Compaction testing

Nuclear density testing on every lift with written reports.

Line painting & signage

Centre lines, edge lines, stop bars and sign installation to MUTCD.

Our process

Four steps from quote to sign-off.

01

Design

Survey, drainage design, mix specification and phasing plan.

02

Clear & excavate

Strip, excavate to subgrade, install culverts and subsurface drainage.

03

Base

Compacted granular base in 150mm lifts, density-tested.

04

Pave & finish

Binder course, surface course, compaction, line painting, sign installation.

Road Surfacing gallery

Road Surfacing projects we have delivered.

Real jobs from our crews. Click any image to view full size.

Questions

Frequently asked about road surfacing.

Still have a question? Give us a call, no-obligation advice is free.

647 8471 430
Do you work on public roads?
We work as subcontractor on public road projects, and as prime contractor on private roads, industrial access roads and subdivision infrastructure.
What's the minimum project size?
We mobilise road crews for projects of 1,000 tonnes of asphalt or more. Below that, our driveway/parking lot crews handle it.
How long does a road paving project take?
A typical 1 km subdivision road build runs 3 to 6 weeks from break-ground to line-painting.
Do you manage traffic control during road works?
Yes. Our book 7 traffic control plans are MTO-approved, and we provide certified flag persons and lane-closure equipment.
What is your MTO prequalification status?
We are prequalified for MTO subcontract work up to category C (road works under $2M per project).

Ready to get started on your road surfacing?

No deposit. Pay only when you are 100% satisfied. Free written quotes.