SAFEWAY CONTRACTORS
Roofing | Masonry | Paving
Paving

Parking Lot Surfacing across Ontario

Full paving packages for retail, industrial, multi-unit residential and institutional parking lots.

Overview

Why this service matters, and how we approach it.

A commercial parking lot is a revenue surface: when it's closed for repair, you lose customers and tenants. We plan jobs around your trading hours, stage work in phases to keep access open, and finish on the day we promised.

We handle full new-construction parking lots, mill-and-pave resurfacing, structural repair of failed sections, line painting and ADA-compliant accessibility markings. Night and weekend work available for retail and restaurant clients.

Get a free estimate

Tell us about your project, we'll respond within one business day.

No deposit required
Pay on completion
Same-day call-outs
Free, no-obligation quotes
What's included

How we approach every parking lot surfacing project.

Staged phasing

Work split into sections so business stays open through resurfacing projects.

Night/weekend work

Available for retail, restaurants and 24/7 operations.

Full line painting

Stalls, directional arrows, fire routes, accessible parking and hatched no-park zones.

Catch-basin & drainage

Parking-lot drainage rebuilt to prevent puddling and ice formation.

Our process

Four steps from quote to sign-off.

01

Survey & phase plan

Assess condition, stage work around your business operations.

02

Mill or excavate

Mill off worn surface or excavate failed sections to sound base.

03

Pave

Tack coat, hot-mix asphalt (HL3/HL4), compact with rollers.

04

Line paint

Chalk lines, stall painting, directional markings, signage installation.

Parking Lot Surfacing gallery

Parking Lot Surfacing projects we have delivered.

Real jobs from our crews. Click any image to view full size.

Questions

Frequently asked about parking lot surfacing.

Still have a question? Give us a call, no-obligation advice is free.

647 8471 430
Do we need to close the lot?
Not fully. We stage work in phases so you always have at least 60 to 70% of the lot available.
Mill-and-pave or full rebuild?
If the base is sound and only the top 50mm is worn, mill-and-pave at half the cost. If potholes and alligator cracking show base failure, full rebuild.
How long does the paint last?
Standard traffic paint gives 12 to 18 months on heavy-use lots. Thermoplastic (heat-applied) lasts 3 to 5 years but costs 3x more.
Can you install EV charging station pads?
Yes. We pour reinforced concrete pads sized for level-2 and level-3 EV chargers, including bollard protection and conduit for electrical service.
Do you handle snow-damage repair in spring?
Yes. Plough damage, salt scaling, frost-heaved catchbasins and pothole blow-outs all get addressed in one mobilisation.

Ready to get started on your parking lot surfacing?

No deposit. Pay only when you are 100% satisfied. Free written quotes.